ENER
Sabiha Gökçen (Kurtköy) Uluslararası Havaalanı
Üst Yapı Tesisleri II. Kısım İnşaatı
Project Name
Sabiha Gökçen (Kurtköy) International Aırport Facilities Super Structure 2nd Section Construction
Client
Republic of Turkiye, Ministry of Defence Construction, Real Estate and Nato Security investment Bureau.
Contractor
Ener İnşaat Savunma Sistemleri Sanayi ve Ticaret A.Ş
Date of Contract
16.07.1999
Project Duration
467 Days
Consultant
Hes Müşavirlik
Project Description
Entry Check Building , Flight Tower, Technical Block ,Meteorology,Administrative Services Building (8 Blocks), Main Power Distrubution Transformer Facilities, MV Supply Cable Network, Diesel Generator Groups, Gendarme Security and Guest House buildings, Naturalgas Service Building, Miscellaneous Site Works, Additional Cargo Apron, Cargo Area Common WC Building, Flight Route ''A''Gate Entrance Check Building and Road Infrastructure, Plumbing Works, Heating Sytem, Common Plumbing Works, HVAC, Automation System, Kitchen Plumbing& Electrical Works, Cold Storage Plumbing & Electrical Works, Naturalgas Distribution Network, Laundry Room Plumbing & Electrical Works,Natural gas distrubution Pipe Network, Total Installed Power of 700kW UPS System and Network, Air Contidioner & Zone Automation System, Underground Phone Network, Miscellaneous Electrical & Electronic Works, Border and perimeter Wiring, İmproving of North Ağıl River, Security Seperated with Laminated Glass.
Excavation Works
452.230m³
Back Filling Works
612.425m³
Formwork
63.387m²
Concrete
28.872m³
Re/Bar
1409ton
High Quality Concrete Coating
30204m³
Plaster
34858m2
Paint
42715m²
Gas Concrete
11445m²
Steel Construction, Truss Beam, Miscellaneous Steel Works
216ton
Sandwich & Deck Sheet Roof Cladding
5.028m²
Floor Covering (Granite - Artificial Marble-Self Levelling-seramic)
9892m²
Aluminium Joinery and Facade Jacketing
29.984kg.
Water & Heat Insulation
32.722m²
Facade Cladding (Granite- alu.Grill-Sandwich panel)
5756m²
Glazing
1832m²
Constructed Building Area
3.250m²
Control Tower Height
37,10m.
Transformer Buildings
4.033m² (22 No's)
Wire Fence
22.360m
Apron Area Construction
74.234m²
Concrete Double boxed Culvert (2 m x 2,5 m)
345m.
Central Air Unit
6,600-2x10,00-15,750m³/h
Cooling Unit
610,000kcal/h
Precision Air Conditioner
2x15,8kW
P.E Insulated 8" Steel Natural Gas Pipe İnstallation
2.635m.
SDR 11 PE Naturalgas Pipe
7.805m.
Naturalgas Pressure Regulation Station
4.500m³/h (1No)
Naturalgas Pressure Regulation Station
25m³/h (29 No's)
Transformer Manufacturing
6,3kV/0,4 - 7MVA - 31No's
M.V. Cable Network
6,3kv- 32KM.
Diesel Generators
1,600kVA - 3 No's
Cold Storage
1,850 kcal/h
Phone Network Cabling
27 km.