ENER
ANTALYA TANK ÇİFTLİĞİ İLE ANTALYA HAVAALANI ARASINA 10" AKARYAKIT BORU HATTI BAĞLANTISI YAPILMASI İNŞAATI
Formworks
819 m2
Re/Bar
11 tons
Concrete
205 m3
Excavation
50200 m3
Trench Sand
9430 m3
Hyrostatic Test
28900 m
32 Lb Magnesium Anode measurement box
1261 No's
5.0 Lb Magnesium Anode measurement box
13 No's
Measurement Box
110 No's
Steel Works
9304 kg
F/O Cable
34180 m.
P.L. Intrusion &Leak detection system with F/O cabling
1 set
Rectifier system
1 set
Project Name
Connection of 10" Fuel Pipe Line Between Antalya Tank Farm and Antalya Air Base
Client
Republic of Turkiye, Ministry of Defence Construction, Real Estate and Nato Security investment Bureau.
Contractor
Ener İnşaat Savunma Sistemleri Sanayi ve Ticaret A.Ş
Date of Contract
02.02.2016
Project Duration
476 Days
Consultant
İMC Proje Müş.Mim ve Müh. Ltd.Şti
Project Description
The 10” fuel pipeline have a tie-in with the existing 8” fuel pipeline in Antalya Korkuteli intersection, passing through Kepez Municipality City Forest – Duacı Village – Mazı Mountain and crossed Kepez province borders.Parallel along The Düden Çayı,Antalya-Alanya Highway and Düden Çayı passed with turust-boring ,and reached to Antalya Int.Airport Air Base Head Command .Crossing of Two parallel Runways with Trust-Boring 28919 km of P/L route has been accomplished including Intrusion/Leak Detection system with F/O cabling.
P/L Class
Fuel
Design Pressure
70 bar
P/L Diameter
8" PE insulated steel pipes 39 m. 10" PE insulated steel pipe 28861 m. 14" Caisson steel pipes 2753 m.
Line Pipes Spec.
P.E coated PN100 API 5L X42 Steel Pipe
Thrust Bore (with 14'' cassion pipe)
1788 m
14" Cassion pipe road crossing
965 m.
River/Road Crossing (Concrete Coated Steel Pipe)
112 m.
P/L Leak and intrusion detection System &Communication Line
Set
6''(DN150) Class 150 PN 20 Gate Valve
2 No's
10" (DN 250) CLASS600 (PN100) Gate Valve (adet)
19 No's
3 Way Valve Pit
3 No's
Block Valve Pit
10 No's