BALIKESİR, BANDIRMA, ARİFİYE TANK ÇİFTLİKLERİNDEKİ AKARYAKIT TANKLARININ RESTORASYONU
Project Name :
Restoratıon Of Fuel Tanks In Balıkesır Bandırma Arıfıye Tank Farms
Client :
Republic of Turkiye, Ministry of Defence,Nato General Directorate of Logistics Security investment Bureau.
Contractor :
Ener İnşaat Savunma Sistemleri Sanayi ve Ticaret A.Ş
Date of Contract :
09.03.2021
Project Duration :
495 Days
Consultant :
İMC Proje Müş.Mim ve Müh. Ltd.Şti
Project Description :
Restoration of 1250 m3 fuel oil storage tank at Balıkesir, supplying storage tanks,flame retainers,hand pumps ,renovation of concrete pavement, epoxy coating & paint and various restoration works at Balıkesir-Bandırma and Arifiye NATO Tank Farms
Excavation :
2526 m³
Backfilling :
2178 m³
Crystalized Waterproofing :
1543 m²
Concrete Coating :
408 m²
Drainage Tank and extensions 1 m³ :
2 unit
Drainage Tank and extensions 1,5 m³ :
2 unit
Drainage Tank and extensions 2 m³ :
1 unit
Drainage Tank and extensions 10 m³ :
3 unit
Drainage Tank and extensions 100 m³ :
1 unit
Epoxy Paint :
1335 m²
Epoxy Coating :
606 m²
Hand Pump 1" (DN 25) :
4 unit
Dry System Flame Retainer (SDD),PN16(150 LB),6”DN 150 :
1 unit
Dry System Flame Retainer(SDD),PN16(150 LB),3”DN 80(1-A TYPE) :
3 unit
Liquid System Flame Retainer (SDL ), PN 16(150 LB),1”DN25(C TYPE) :
3 unit
Measuring and Sampling Equipment :
3 unit
Various Sizes Gate Valves :
38 pcs
Various Size PE Insulated and Steel Pipe Laying :
291 m
Hydrostatic Test :
1233 m³
Miscellaneous Steel and Sheet Iron Works :
71466 kg.
1X16mm Cable Laying in the Trench :
2965 m
Grounding Electrode :
86 pcs
Magnesium Anode :
34 pcs
Zinc Anode