1999 YILI DOĞU-BATI ANADOLU AKARYAKIT BORU HATTI HASARLARI ONARIMI İNŞAATI VE WARDAM II TEÇHİZATI RESTORASYONU
HEKIMHAN FLOOD DAMAGE GEBION STONE-FILL MANUFACTURE BURSA C, ATALTEPE PIPELINE MANUFACTURE
In Military pol facilities, repair and maintenance work carried on the flood-damaged Nato petrol pipelines. The Project, where a total of 2531 mt. of pipeline were changed and 2000 m3 stone-ffilling made, has been carried on simultaneously at 15 sites - 3 sites in East Region and 12 sites in West Region
AKHİSAR, GÖRDÜK STREAM PIPELINE MANUFACTURE
ARAP HACI VILLAGE FLOOD DAMAGED PIPELINE REPAIRS
AGA STREAM FLOOD DAMAGED PIPELINE REPAIRS ADAPAZARI, BA6LARBA51 FLOOD DAMAGED PIPELINE REPAIRS
In different sections of TURKIYE, a total of 16 cranes, 1,5 tons and 6 tons and were installed in wardam station.
Project Name
Client
Contractor
Date of Contract
Project Duration
Consultant
Project Description
P/L Class
Design Pressure
P/L Diameter
Trench Excavation
Generator Purchase and Installation
Overhead Crane Purchase and Installation
Line Pipes Spec.
River crossing
Rock Backfilling
32 Lb Magnesium
Anot measurement box