ENER
TAFİCS 1.AŞAMA PROJESİ 1.GRUP N2(NODAL)
ÇORLU DÜĞÜM NOKTASI
Project Name
TAFICS 1st.Phase Project,1st. Group N2 ÇORLU Nodal Switch
Client
MAKTAŞ Makine ve Elektrik Tic. A.Ş.
Contractor
Ener İnşaat Savunma Sistemleri Sanayi ve Ticaret A.Ş
Date of Contract
01.02.1997
Project Duration
450 Days
Project Description
Nodal Switch building icluding,EMP Protected Equipment Building with dimensions of 200m2 and top of it a Penthouse with dimensions of 34m2 and a Residential Area with dimensions of 260m2 and an 8m. Underground Escape Tunnel. This facility includes fully reinforced concrete(1.0m.x1.0m.x1.0m.), a garage with dimensions of 210m2 , a guard house, a garage boiler room , length of 372m wire fencing and lighting system. Buildings includes generator, lightning protection system, indoor and outdoor earthing system and network, air conditioner, firefighting and alarm system and central heating system. . Nodal Switch has also including 25m3 underground fuel storage tank , a 10m3 underground water tank ,waste water system ,600m2 concrete paved area and 64m retaining wall. EMP Protected Equipment Building includes various filters such as power line, communication, data line, and EMP protected as well as Blast main door and Blast valves.
Excavation
3935m³
Backfilling
4235m³
Safety Fencing
373.5m.
Concrete Coating
600m²
Formwork
5267m²
Re-Bar
82ton
Concrete
817m³
Miscellaneous Steel Works
7875kg.
Roof Construction
262,8m²
Fuel tank
35m3
Water Tank
25m3