BOZÜYÜK - MEKECE YOLU İYİLEŞTİRME PROJESİ II.KISIM İNŞAATI İŞİNDE KM: 1+230-1+580 BİLECİK-OSMANELİ AYRIMI GÖLPAZARI BAĞLANTI YOLU NATO AKARYAKIT BORU HATTININ DEPLASMANI
GOLPAZARI PIPELINE REPAIRS
The Project consist of, replacing 380m. Of Nato Oil Pipeline With PN150 PE isolated steel pipe and 130m. With 4" GR-B steel pipe, under the control of Ministry of Transportation of Torkiye and Limak Ind. A.S.
GÖLPAZARI STREAM PIPELINE REPAIRS, CULVERT CROSSING, ROOD CROSSING
HOLIDAY DEDECTOR TEST, HYDROSTATIC TEST