BOZÜYÜK - MEKECE YOLU İYİLEŞTİRME PROJESİ II.KISIM İNŞAATI İŞİNDE KM: 1+230-1+580 BİLECİK-OSMANELİ AYRIMI GÖLPAZARI BAĞLANTI YOLU NATO AKARYAKIT BORU HATTININ DEPLASMANI
Project Name
Motorway Renewal Project At II. Sectıon- Nato Oil Pipeline Variant Works Between km(1+230-1+580) Gölpazarı Motorway
Client
LİMAK İnş. San.ve Tic. A.Ş.
Contractor
Ener İnşaat Savunma Sistemleri Sanayi ve Ticaret A.Ş
Date of Contract
17.02.2010
Project Duration
245 Days
Consultant
Eser Müşavirlik Müh. A.Ş.
Project Description
Within the Scope of Bozüyük - Mekece Road Maintanence Works, Existing Oil Pipeline has been Displaced.
P/L Class
Fuel
Excavation
1601m³
Creek Crossing
25m.
Hydrostatic Test
488m.
6" PE Insulated Steel Pipe
384m.
4" GR-B Naturalgas Pipe (5.2 thickness)
104m.
10" Spiral Welded Steel Pipe
56m.